Full range of services for construction design

The construction site is no place for experiments

Build your house according to a clear plan

Book a meeting with our leading architect right now and get our professional advice for free

Construction design is

A construction design is a guide pointing out a clear route to the contractors. It will help you not to go astray during progress of the works, to choose equipment and materials, to avoid uncertainties during acceptance of each stage. Of course, if we speak about a quality, precise project. A plan worked out by a professional will let you keep within the budget and build the ideal house.   

Dmitriy Davidovskiy

Construction engineer

Meet our leading architect

WHO NEEDS A CONSTRUCTION DESIGN AND WHY

CUSTOMER
Detailed drawings let us calculate exactly the construction budget, control the work of construction gangs.
CONSTRUCTION WORKERS
Erection of the house according to the construction design lets the contractors set the exact prices for their works and carry out construction works with no time lost for approval of uncertainties with the customer and architect

The document is made in 2 copies
One copy is for the customer, the other one is for the contractor.
Also, the customer gets a digital copy of the design in order to send it to the contractors and suppliers

WE WILL TELL YOU ABOUT MISTAKES MADE BY 85 % OF THE CUSTOMERS

WHAT DOES A CONSTRUCTION DESIGN INCLUDE?

WHAT DOES A CONSTRUCTION DESIGN INCLUDE?

Architectural solutions

1. A list of general data (a list of drawings, explanatory note, technical and economic parameters of the house)
2. General floor layouts (room areas, arrangement of the main furniture and sanitary equipment)
3. Sections in the feature places (elevations, storey heights, floor systems)
4. A roofing plan (elevations, pitches, areas)

View a design
discipline example

View

5. Facades (areas of facade finish, elevations, faсade colours, slope)
6. Brickwork plans of the floors (with ventilation openings, closures, door lintels, dimensions of the door openings, types of the doors marked)
7. Floor plans (areas and types of the flooring materials, lengths of the floor mouldings, elevations of the floors)
8. A flooring schedule (a list containing sketches of the make-up of different types of floors with calculation of the area of the materials)
9. A room finish schedule (a table specifying types of shell&core fit-out of the walls and ceilings of each room with calculation of the areas)
10. A door schedule (types, dimensions, and the way of door pull, number of the doors)
11. A window schedule (types, dimensions, and the ways of opening the windows, their quantity)
12. Developed views of the air drains (detailed drawings of the air pits with detalization of opening places)
13. Drawings of the doorsteps, terraces, sheds.
14. Drawings of the staircase (large-scale staircase drawings with thicknesses and elevations of the final finish)
15. Decisions for the base units, window openings, roof projection, facade insulation, ridgy unit of the roof.

WHAT DOES A CONSTRUCTION DESIGN INCLUDE?

Design concept

1. Lists of general data (a list of drawings, general instructions for execution of construction works)
2. A diagram of the foundation solid-cast pad moulding
3. A diagram of the foundation moulding
4. Diagrams of bottom reinforcement of the foundations

View a design
discipline example

View

5. Diagrams of upper reinforcement of the foundations
6. Lists with the units and sections of the foundation reinforcement
7. Diagrams of protruding reinforcement of the foundations (if any)
8. A spread list of the reinforcement and concrete of the foundations
9. A diagram of the foundation walls (if any)
10. Diagrams of the cast-in place reinforcing belts
11. The units and specifications of the requirements for the reinforcement and concrete of the cast-in place reinforcing belts.
12. Diagrams and specifications of the concrete floor slab moulding
13. Diagrams and installation places of the window headers
14. Fixture elements of the partitions
15. Formwork plans and staircase sections, specifications of the requirements for the reinforcement and concrete
16. Moulding diagram of the frame of the roof
17. The sections and units of the frame of the roof
18. Elements specification of the frame of the roof
19. Formwork diagrams of the terraces and doorsteps with specifications of the requirements for the reinforcement and concrete

Problems you may face during construction works without a design

1
Wrong diagram of the exterior wall-foundation junction
The wrong diagram of the exterior wall-foundation junction has been chosen. As a result, after insulation of the base, the dado of the house protrudes extensively and looks non-aesthetic.
2
Foundation failure
During erection of the foundation blocks the bottom width of the internal and external walls was made equal at different loads and without consideration of the geology of the soils, what resulted in foundation failure and, as a result, in structural cracking
3
Coming off of the tile
Absence of waterproofing and insulation of the foundation, and of pavement around the building has resulted in coming off of the tile and appearance of white efflorescence on the joints
4
Crack formation
The slabs rest directly on the Ytong/claydite/clay aerated block work without an armor-clad belt, what may result in falling of the walls at the wall-foundation junction
5
Load on the ceiling slabs
The partition links at the top on to the ceiling slab without a densifier, being an intermediate support for the slab, what may result in the cracks in the partition and ceiling slab.
6
Mold formation
During construction of the balcony thermal bypasses were not considered, what resulted in congeliturbation of the adjoining ceiling slab and formation of mold.

OUR LATEST CONSTRUCTION OBJECTS

  • Country mansion at the Tekstilshchik Horticultural Society

    The design of a country house at the Tekstilshchik Horticultural Society in the suburbs of Minsk.

    Gross floor area: 115 sq.m.

    Dimensions: 15.0 x 10.0 m

    Start of designing: Year 2015

    Start of construction: Year 2015

    Cost of the house construction + interior: 140 000$

  • Country mansion in the town of Cherven

    The design of a residential single-family house in the town of Cherven in Minsk region. The house with a half storey, inclined roof and outdoor terrace.

    Gross floor area: 185 sq.m.

    Dimensions: 13.5 x 12.0 m

    Start of designing: Year 2016

    Start of construction: Year 2016

    Price 90 000$

  • Country mansion in the village of Cherkassy

    The design of a two-storeyed residential house in the village of Cherkassy in the suburbs of Minsk.

    Gross floor area: 185 sq.m.

    Dimensions: 13.6 x 13.9 m

    Start of designing: Year 2015

    Start of construction: Year 2015

THE PROCESS OF DESIGNING YOUR FUTURE HOUSE

Construction design is developed only if you have a scheme design

1

шаг

YOUR REQUEST ON OUR WEBSITE

You make a request on our site and wait for our call in order to agree on the convenient date and time of meeting with our architect.

2

шаг

PRE-DESIGN PREPARATION

  1. Interview
  2. Technical assignment, signing an agreement 
  3. Visiting the construction site

3

шаг

CONSTRUCTION DESIGN

  1. Geological survey 
  2. Working our several structural layouts
  3. Feasibility comparison of the options 
  4. Choosing the optimal option
  5. Detailed design documentation on the foundations of the building  
  6. Detailed design documentation on the superstructure of the building 
  7. Construction materials specification
  8. Construction estimate of the house
BOOK A MEETING WITH OUR LEADING ARCHITECT RIGHT NOW AND GET OUR PROFESSIONAL ADVICE FOR FREE
form-free-meting

TESTIMONIALS

  • Mikhail

    I came to the company with the existing design (it had been developed earlier at a private architect bureau). We had to slightly adjust a design discipline. The specialists carried out surveys again absolutely free of charge. The surveys are necessary for clarification of details directly on the purchased lot неполный текст в исходнике is said: “In God we trust, the competitor we check”. The house was built. There were some faults неполный текст в исходнике, but if you are not so particular – in general everything was all too well. неполный текст в исходнике There was no rise in prices.
  • Anna

    For a long time me and my husband have been thinking how to build a reliable house of our dream without big rises in prices and gouging of the cost estimate. We have looked through a lot of existing designs – we kind of wanted to have our cake and eat it. That’s why, in order not to vex our minds endlessly with planning, we decided to contact professionals! Specialists of the company helped us to choose the design according to our wishes and, most importantly, budget. After start of construction, there were no unforeseen suspensions, everything was in a consistent way, with no downtime. Thank you for our new house!
  • Margarita

    We entrusted the design of our new house to the “Kvartira No. 17” company and didn’t regret. We wanted the house to be built неполный текст в исходнике, but at the same time cozy, with comfortable living environment for the family and, most importantly, reliable! The specialists took into consideration all our wishes for the exposure, facade colour and even window sizes! Finally, we realized everything we wanted: up-to-dateness, spaciousness, and comfort. There were some small problems with the deadline: the workers were slightly behind schedule. But that is not critical. We give our thanks to the team of the company for their support during the construction and help in realizing all our wishes!
  • Vadim

    Before starting construction of the cottage, I asked my friends and acquaintances, which company was the best in designing the future house. They recommended the “Kvartira No. 17” company and that was not a mistake. At first, I visited the construction site several times per week, in order to control the process. But it turned out that I could do that not so often. The workers and management of the company considered my wishes and comments, saved worry and vanity regarding the construction progress. Finally, I got my own cottage at a reasonable price, before the deadline and according to the desired design.
  • Aleksey

    I ordered a custom design. Thanks to working with an architect, his lateral thinking, and experience of work with demanding customers, we had an up-to-date and worthwhile product as a result of our work. The specialists of the company fully developed the design concept, calculated the material quantity, took into consideration the results of the geological survey. In spite of my scrupulousness, I have no complaints against the completed works: the deadline has been met, the previously approved cost estimate has been fully observed, one can feel an individual approach to the clients. My impressions from our co-operation are positive. I recommend!

You can wait. You can choose for a long time.
But you can also contact us and start building the house of your dream!